当前位置:首页>>Product>>YB-JF DECK COVERING>>YB-JFC Super Light Primary Deck CoveringYB-JFC Super Light Primary Deck Covering
YB-JFC Super Light Primary Deck Covering
品牌:TianDun            型号:YB-JFC

 YB-JFC Super Light Primary Deck Covering is composed of latex (group a), powder (group b) and aggregate (group c). This product has the advantages of elasticity, anti-vibration, anti-impact, low density, water resistance, corrosion resistance and so on, and is suitable for the laying of non-inflammable cabin deck and other ship deck.

TEL:(86)21 5509 0626 在线订购

产品说明

安装说明

Number

Items

Index

Operative standard

1

Density

≤800kg/m3

Q/SSXS 01-2010

CB/T 3361-1998

2

Flexural strength

≥3MPa

3

Pressure strength

≥8MPa

4

Initial setting time

≥1h

5

Final setting time

≤24h

6

Incombustibility

In line with IMO.FTPC Part6

7

Smoke and toxicity

In line with IMO. FTPC Part2

8

Weight per unit area

0.75kg/ m2﹒mm

9

Sound reduction index

≥35dB


Blending ratio: one bag powder matching with on bag aggregate and one pot emulsion.

1.Before the deck covering is laid out, deck related engineering, such as welding, hot working, pipelines, cables, wind pipe, and enhancer that penetrate the deck, and water testing in the tank, should be finished beforehand.

2.Impurities on steel plates are to be removed while all rust, oxide scale, old paint, etc. are to be removed so that no oil, no water and no debris remain according to the requirements of Grade P2 in CB3230.

3.The deck surface is uniformly coated with a layer of interface agent, to be transparent after the laying of the deck dressing.

4.According to the proportion of emulsion, powder and aggregate, firstly blend the powder and aggregate evenly with a mixer at the speed of 100r/min, then pour the liquid in and mix them for 3min, and start the construction immediately. Make sure to use it up within one hour.

5.Pour the mixed covering onto the steel plate, and level and smooth the covering with a scraper bar.

6.After 30 minutes, consolidate the covering layer with a trowel and scraper bar to the required thickness and level the surface within 3mm/m. If the surface is a bit too hard for leveling, spray some emulsion first.

7.The constructed covering layer should be kept for maintenance for2 to 3 days under the condition of normal vertilation. The covering cannot be stepped on until it is basically hardened.

8.After the covering is completely dry and hard, i.e. approximately one or two weeks, the deck, leveling covering or plastic floor can be conducted.